Synergy Drive

Synergy– NOUN

Def – The interaction or cooperation of two or more organizations, substances, or other agents to produce a combined effect greater than the sum of their separate effects, i.e.,‘the synergy between artist and record company’ (English Oxford Living Dictionary)

Here we are in a country with more wheat, and more corn, more money in the banks, and more cotton, more everything in the world. There’s not a product that you can name that we haven’t got more of it than any country ever had on the face of the earth and yet we’ve got people starving. We’ll hold the distinction of being the only nation in the history of the world that ever went to the poor house in an automobile. – Will Rogers (1931)

Some weeks ago, I had the opportunity to attend professional meetings in Uniontown, Pennsylvania.  Uniontown is a delightful old community, the seat of Fayette County and a waystation for the original National Road, now Route 40.  Founded on July 4th1776, the town now has 10,000 inhabitants and a rich history which intersects with The French and Indian War, the underground railroad, coal and mining history and labor unrest.  Arguably its most famous son was George C. Marshall, Eisenhower’s boss during WWII and the architect of the eponymously named Plan that saved Europe from economic catastrophe after said war.

The meetings were held at a hotel a few miles west of town and outside of the Route 119 belt in what could be best described as a 10-year old Miracle Mile-type development including a Walmart, shopping centers, chain restaurants, and two other hotels.  At least that’s what I could see perched on the front entrance of the hotel overlooking US 40 below. (http://www.racfpa.org/news/2008/030808WalmartOpens.pdf)

I was on my own for dinner and decided in the interest of time to take a meal at the Applebee’s off in the distance to the right.  I also thought I might get something for breakfast at the Walmart, which my laptop assured me was also a grocery store.  Those of you that know me, know I am a stubborn person and in fear of having my 66-year old legs lock up during long meetings, I decided that I needed to walk.  The total distance was only about a mile, so off I went.

Once I had left the lobby of the hotel, I discovered the sidewalks disappeared.  No problem.  I marched down the side of the potted and cracked entrance road, looking like a poor man’s I-78.  Reaching US 40, I availed myself of both the crosswalk and the pedestrian signal crossing, reaching the other side of the road with no concerns and no knowledge of what awaited.

Our helpful signal crossing
My hotel on the upper left. Sidewalks anyone?

Oddly, the sidewalk I expected did not appear immediately, but about 20 yards ahead. Putting my feet firmly on concrete and off the road, I continued my foray toward dinner and groceries. Gazing ahead, there was a side road that seemed to be in the direction of my planned meal, along Synergy Drive. That sounded promising. After all, Synergy Drive is what Toyota calls their hybrid system we have on our Prius.  As I made my turn into Synergy Drive, I searched for a sidewalk, or at least a path to be had.  Actually, on the side facing traffic where you would normally walk, there was a guiderail protecting cars from driving into a ditch, but also protecting any perspective pedestrians from perambulating into that portion of the path. Stubbornness put me into an unsafe situation, so of course I pressed on.

Our Synergy Drive

In addition to walking in the road that had no shoulder, it was dusk, no lighting except for the businesses, and I wasn’t all that visible.  Cars seemed to see me though and I made it to the crossroad with my destination and dinner on the other side.  Crosswalks anyone? Nope.  Traffic island? Nope.  Cars zipping in both directions in and out? Yep.  Patience bought me time to get across safely and take my meal.  I have nothing against Applebee’s but that is not my usual choice.  When placed against All-Star Asian Buffet, Arbys, Bob Evans, IHOP, and Sonic, it became my least worst choice.  I was looking for a beer and something lighter, like a salad.

What passes for a sidewalk

Having eaten, I wormed my way further into the shopping center, toward the Walmart and breakfast foods.  In addition to the Shopping Center having no sidewalks and no crosswalks, the roads had been neatly and carefully gridded so that each street was separated vertically from the next, much like the terraced fields in the highlands of Mexico.  Each road had no shoulder, only a guiderail keeping you from a 10 foot drop. Thoughtful for driver safety, but not traversable on foot.

Because you are reading this after the fact, you can assume I made the trip to the Walmart and back to my room.  Cheese, fruit, yoghurt.  Mostly retracing my route, I did find remnants of worn grass where other adventurers had ventured.

I would summarize the trip as essentially impassable on foot.  No pedestrian access, no sidewalks, no crosswalks, no shoulder, no lighting.  This was surprising as there were two other hotels in the same complex as the shopping center.  On the trip down and back, I saw exactly one other pedestrian on foot. Actually it was a teenager on a skateboard and therefore not a pedestrian. How did any of the other guests get their meals?  Were they all hermetically sealed into the hotels?  Were they on complimentary breakfast-only diets?  I didn’t want to think that they would drive the couple hundred feet from their lobbies to these establishments.

And what establishments – chain restaurants notable for high sugar, high fat, high carbohydrate meals.  When checking out potential places to eat near the hotel, I came across the Route 40 Diner, less than a mile from the hotel.  Real diners are a gift from the gods and I had it penciled in for at least 5 of the 4 meals I had planned to take.  A (historic) diner meal on the National Road.  What the map failed to disclose was the most recent review was 5 months old and the place had closed,  probably from competition from the chains.

For me, the whole episode equates to what we used to call a first world problem.  I was minorly inconvenienced.  But I do wonder what logic prevents groups of guests in the three neighboring hotels from being able to walk a short distance to their amenities, my polite choice for these chain restaurants and Walmart? And logic was in play as this was clearly not an accidental development.  Everything was organized for vehicular traffic flow and I’m sure it never occurred to the planners and developers that people might want to not be in their vehicles 24/7.

Synergy – The interaction or cooperation of two or more organizations, substances, or other agents to produce a combined effect greater than the sum of their separate effects.

Nowhere in the definition does it require that the combined effect of synergy be positive. America has an obesity crisis (among many crises).  In Pennsylvania, Fayette County is ground zero. 2015 health data has Fayette County’s obesity rate at 41%, highest in the state.  Fayette Countians exercise less and smoke more.  Should I add that Fayette County with a 17.9% poverty rate is the third poorest in the State. Only Philadelphia and Forest Counties have a higher poverty rate.  

That same 2015 survey measured the Food Environment Index, which is a combined measure of access to healthy foods and food insecurity.  Fayette County was second only to Philadelphia as having the worst Food Environment Index.  Leaving aside the fact this new development was a “good food” desert, the Walmart grocery was completely packed.  But the produce and dairy selections were somewhat limited, highly prepackaged, and non-organic, although I could find the basics. 

So to address poverty, obesity, and food insecurity, the planners and developers in Fayette County throw out another strip mall development to accommodate visitors and offers service jobs for the locals. The same poor planning that fosters obesity, food deserts, and the low paying jobs that keep people poor.  The Commonwealth of Pennsylvania also participated with almost $20 million in redevelopment funds and an extension road to connect the development to the Mon-Fayette Turnpike Road.  Synergy Drive.

The tradition of screwing the poor is a long one. On the site of this 2008 shopping center development was the County Poor House and Farm, built in 1825.  The imposing building appears to have been torn down, and the farm with it. The complex also contained a burial ground most likely for those unfortunate individuals who died at the Poor House or could not afford a decent Christian burial.  Most of the graves were unmarked but this did not deter the County Redevelopment Authority, who owned the land from redeveloping it.  Were all of these unmarked graves with no apparent descendants or advocates carefully located and reburied?  As an archaeologist in Pennsylvania, I would say unlikely, especially referencing the cryptic statement from Larry Golden (see link below on US Cemetery Project).  You might say that this redevelopment not only succeeded in creating jobs and putting Fayette County’s best foot forward, but also succeeded in erasing the past, specifically the history of the county poor. 

Fayette County Home, early 20th Century
Fayette County Cemetery Memorial

The United States Cemetery Project

The wealthy always have options, whether it’s eating at one of the good restaurants in Uniontown or having the time to drive to the better supermarkets.  The poor will always be with us.  But between the poor houses of the 19thcentury and the poor planning of the 21stcentury, why do we have to be so systematically and cooperatively oppressive? Synergy Drive, indeed.

2019 Vicinity
1931 Vicinity
1939 Vicinity

Rural Agricultural Landscapes – Part III

What is the Resource being Affected?

Crossings

As noted in the MPDF overview, “the full flowering of distinctive agricultural regions in Pennsylvania occurred only in the mid-19thcentury” (McMurry 2012a: 7) and that “the widespread transition to a relatively specialized monocrop or single-product system did not really take hold until after the Second World War in Pennsylvania” (p. 4). Fortunately, this century is well documented in maps, first with county atlases in the 19thcentury, followed by early USGS 15 minute and 7.5 minute topographic maps beginning at the end of the 19thcentury and early 20thcentury, and followed by rather detailed and frequent Department of Highways Type 10 maps beginning in the early 20thcentury and continuing today.  It should be axiomatic that earlier roads, and early, improved roads are indicators of principal roadways.  Invariably, investments in roads follows need, particularly when through local funding.  The dichotomy between earthen and improved roads, whether they are concrete, brick, macadamized, and even bituminous macadamized over chipped stone, can speak to whether the local communities considered any individual road important, or principal.  Furthermore, if the history of the Landscape is well known and the peak development of specific agricultural system is marked, then roads improved after that date might not be principal, even if they are within the period of significance.

Adams County 1916 Type 10 Map
Adams County 1916 Type 10 map legend and key
Adams County 1941 Type 10 map key

The upshot of this mapping exercise is that bridge crossings on principal roadways within the Landscape can be identified.  With a reasonable history of the Landscape, principal roadways to market can also be identified, and with them, the associated bridge crossings.  Crossings on principal roadways defined for the period of significance that still retain the integrity of location would be considered contributing,

Substructure

It is anticipated that the types of abutments and/or piers that might be found within rural areas and Landscapes would be stone of local origin, stone quarried from outside the Landscape, or concrete. Stone of local origin, with vernacular construction techniques should be readily obvious on inspection and inspection of nearby stone buildings and structures.  Provided there are no significant later modifications that would substantially diminish the integrity of the substructures (from a NR perspective), then we should assume the substructure would be contributing to the Landscape. For concrete material or quarried stone from outside the Landscape, unless there are local design elements imposed, it would be reasonable to argue the substructure would not be contributing as it would not reflect the local workmanship, methods of construction, materials, stylistic influences, and vernacular forms.

Superstructure

As with the superstructure, the material of construction could be local or exotic.  The design could also be vernacular or state-standard. Again, the test of the superstructure would be whether the materials and construction reflect the local workmanship, methods of construction, materials, stylistic influences, and vernacular forms.  In most instances this would exclude superstructures undertaken by the Department of Highways after WWI (possibly earlier) that followed a state-standard design. The exception to this “rule” would be where a local authority within the Landscape authorized a locally funded and undertaken road and bridge program to improve movement of goods to market that positively relates to the evolutionary trajectory of the farm system in that region.

Practical Issues for the Transportation Historic Preservationist

How Do we Know We are in a Rural Historic Landscape?

More often than not, the transportation historic preservation specialist is working from a project perspective rather than a resource perspective.  It’s the nature of the game.  So what happens when the professional drives into the middle of a rural valley, passing farms, a grange, a cemetery, a Walmart, and a housing development along the way?  Reaching the bridge project, the professional does a 360 and sees all of the above within view.   Is the project in a rural historic landscape or not?  And is the bridge contributing to that rural historic landscape, if present?

In a number of instances, the consideration of a bridge as contributing/non-contributing is taken within a fully evaluated Landscape.  However, this may be the exception rather than the rule.  In the short term, some shorthand may need to be developed to reflect a minimum level of work to ascertain whether a Landscape is likely or not. Use of the MPDF will be helpful in that regard.  As suggested by the Pa SHPO, use of historic aerial mapping to determine levels of intrusion and loss of integrity may be one approach, but one that lacks an adequate historic context.

The longer-range solution might be to take all bridge projects on the Long Range Transportation Program and look for concentrations that may be in potential Landscapes; then prioritize those potential Landscapes for evaluation based on the number of upcoming projects.  Field views would augment research, with an on-the ground evaluation in the vicinity of the bridge project.  This way more bridges projects can be evaluated with less work.  Ultimately, a statewide effort along the lines of the Agricultural Context may be needed to assess potential rural historic districts statewide in some systematic manner.

Possible Tools

The above analysis leaves open the possibilities for numerous bridges in rural agricultural regions that might now be considered contributing to a rural historic landscape.  If a DOT were to treat these individually, then this could become a major impediment to a state’s bridge program.  Certainly in Pennsylvania, and I suspect in other states as well, the largest expansion of bridge building was in the first half of the 20thcentury.  Many of these bridges, which would be standard design concrete stringer bridges of modest length, would have reached their use life and in many cases would not be suitable candidates for rehabilitation, certainly not to SOI standards. Rather than treating Section 106 (and 4f) on a case by case basis, this class of action would be a good candidate for a programmatic approach.  To that end, I am adding a link to a sample programmatic agreement for bridges in rural historic landscapes.

Sample Section 106 Programmatic Agreement

For DOT’s, Section 106 is only part of the equation. There is also Section 4f. And if you don’t normally deal with 4f, I would strongly urge that you stop reading now and find something more useful for your time. For those of you who are involved with 4f, there is a potential glitch in the application of the Nationwide Programmatic 4f for Historic Bridges.  When the project does not use any historic resource other than the bridge itself and the bridge does contribute to a historic district, then the current Nationwide PA for Historic Bridges is the right tool for the right job.  However, if the project requires any right of way from any portion of the rural historic district/landscape that is contributing to the District as well as the bridge itself, then depending on which FHWA division you are in, you may be in a bind. Because the Nationwide PA for Historic Bridges only covers the bridge and not other contributing properties, you might find yourself completing an individual 4f for the project, much more work.  Some FHWA Divisions have work arounds and avoid this issue, but if yours does not, then I am providing a sample text for a state-level programmatic 4f to cover the situation.  I hope you never need to use it.

Please note the language in both programmatic agreements are as generic as I could manage; however, if you do plan to use them, I would highly recommend that you run the language by both your FHWA division and your own lawyers, even before you bring this to the SHPO for further discussion.

Sample Section 4f Programmatic Agreement

Rural Agricultural Landscapes – Part II

Roads and Bridges in a Landscape

There are many resources within a rural historic landscape (District), some of which are bridges, and these are the specific resources in which we are interested.  How is a bridge part of a landscape and how would we determine what is contributing or not from a significance standpoint?  In considering the landscape characteristics outlined above, a bridge is part of a road system and represents the process of a pattern of spatial organization (McClelland et al, n.d.,p:4).  One feature that is relevant to the landscape characteristic is the pattern of the circulation network, which is further described as “paths, roads, streams, or canals, highways, railways, and waterways.” (p. 16).  For roads and bridges, the documentation is to “describe the principal forms of transportation and circulation routes that facilitate travel within the landscape and connect the landscape with its larger region,” and, to “identify principal roadways and other transportation routes and classify as contributing or noncontributing” [emphasis provided by Bulletin] (p. 16).

This is a critical statement in separating contributing from non-contributing resources.  As part of the circulation network, principal roadways – and their associated components – would be considered contributing.  Roadways that are not principal in the context of the Landscape’s evolutionary history would be considered noncontributing.   This statement also undercuts a view that since agriculture depends on a road system to bring goods to market, the entire network should be contributing.  Methods for considering what roadways are principal are presented below.

The second relevant characteristic is the physical component of Buildings, Structures, and Objects, which in this case, includes the bridges and highways.  The documentation in part is to “identify patterns and distinctive examples of workmanship, methods of construction, materials, stylistic influences, and vernacular forms”, as well as to “describe the principal and most important buildings, structures, and objects, by name, type, location…methods of construction, materials, stylistic influence, and if known, builder” (p. 17) (my emphasis)

Specifically for rural historic landscapes that achieve their significance under Criterion A for agriculture, these physical components as well as the boundary demarcations, the vegetation related to land use, the “clusters,” archaeological sites, and even small-scale elements need to relate to the agricultural land use and activities, agricultural adaptations, and agricultural response to the natural environment.  The historic context within which these physical components should be interpreted has largely been established by the MPDF, but for specific landscapes, telling the story of that farming system’s specific evolutionary trajectory requires that each physical component’s contributing or noncontributing status be filtered through that particular lens. For landscapes in particular, contributing resources provide tangible evidence of that evolutionary trajectory, i.e. they must help tell the story.

Looking at the bridge as reflected in both the circulation network and the physical component of the structure within the Landscape requires that we clarify what we mean when we talk about a “bridge.”  Bridge is a shorthand for multiple features, each of which is relevant to the discussion of whether the “bridge” would be contributing or not.  First, within the circulation network, the bridge is a crossing that connects pieces of the road network.  If we are to concede that the circulation network is an important characteristic of what makes a Landscape significant and what helps define its integrity, we must separate the crossing from the other “bridge” features.  In addition, if we are to assess whether the crossing contributes or does not contribute to the Landscape, we also need to assess which are the principal roads within the Landscape.  It is reasonable to assess principal in terms of which roads and which part of the network were most important to the agricultural functioning of the Landscape, both as an internal system, and, also as an external connection, i.e., bringing products to markets.  A crossing on a non-contributing road would not be contributing to the Landscape.  Crossings on principal roads would be contributing and although this seems a trivial statement, it does factor into matters of effect if a bridge project seeks to close off part of the roadway, or is part of a road relocation that substantially changes the network footprint, such as in a bypass.

The second and third features of the bridge represent the physical component, representing the superstructure andthe substructure.  It is necessary to consider these features separately, because there can be separate construction episodes, as a bridge substructure may be re-used while the superstructure is replaced.  This parsing of the bridge into two pieces requires that each piece be considered separately.  In doing so, the bridge has the ability to more precisely reflect what part contributes and what does not.  

Starting with the substructure, the central question becomes “how does the construction and operation of the substructure, e.g. abutments, wing walls, piers, etc. tell the story of the agricultural evolutionary trajectory of that particular landscape?”  In almost all instances, the substructure of a rural bridge would be composed of stone, or concrete, or a combination of the two.  A stone substructure made of local stone would more likely be able to represent the workmanship, methods of construction, materials, stylistic influences, and vernacular forms that express the Landscape in which it is set.  A stone substructure composed of quarried stone from outside the Landscape, or a concrete substructure, built following a state standard design, would be less likely to express that local workmanship, local method of construction, local material, local stylistic influences, and local vernacular forms that are significant in the landscape’s agricultural evolutionary trajectory.  The difference between stone and concrete could be the difference between contributing and non-contributing elements.  Looking at the substructure by itself, it may also be reasonable to assess whether pieces of the substructure are retained or whether they have suffered the loss of integrity of design, materials, or feeling. For example, if a locally designed substructure has been so modified in repair that it is no longer recognizable, with regards to design, materials, or feeling, the substructure may lose sufficient integrity to no longer be contributing.

Likewise, the superstructure as a physical element can express the landscape’s agricultural evolutionary trajectory or not. Superstructures constructed under the design of a local bridge engineer, or of local (stone) materials, could be argued to help tell the story of the landscape’s agricultural evolution, through local workmanship, local method of construction, local material, local stylistic influences, and local vernacular forms.  These structures would not necessarily have to be early.  During the CCC era, local engineers and workman built bridges out of local material using local knowledge.  These structures might tell the story of an agricultural trajectory of that period, buttressed by an emergency wage economy.  In wealthier regions, the local government might have undertaken a program of bridge construction to improve transportation of goods to market, locally led and locally funded.  These bridges might also tell the story of an agricultural trajectory of that period.

Conversely, a concrete state standard design bridge superstructure (and maybe substructure, too) that is constructed within a Landscape through a statewide bridge building program might be considered non-contributing, as it fails to demonstrate the local, vernacular form, even while maintaining a crossing on a principal roadway. 

Looking at the superstructure by itself, it may also be reasonable to assess whether pieces of the superstructure are retained or whether they have suffered the loss of integrity of design, materials, or feeling.  Commonly in rural settings, the bridge superstructure is invisible to the travelling public and the barriers along the bridge have been replaced several times since original construction.  In this circumstance, the superstructure might not be able to convey the locally important (workmanship and vernacular design) landscape characteristics associated with the circulation network.

Considering all three elements in a bridge, it is possible that any of the three could be considered a contributing resource.  A crossing on a principal road within the Landscape might be contributing, although the substructure and superstructure were state standard-design of non-local concrete.  The substructure might be contributing, having been constructed out of local stone, while the superstructure was a state-standard design that was placed 50 years after the substructure but still within the period of significance.

Determining Contributing/Non-Contributing

The approach outlined here offers an opportunity to closely align decisions about bridges being contributing/non-contributing with both the NR guidance and the MPDF for agricultural Landscapes.  The approach also resolves a certain fuzziness that arises when consideration of a bridge is taken as a simple all or nothing decision that tries to push the arguments into a simple yes/no format, e.g. roads and bridges are a necessary part of any rural historic district, leaving the only unresolved matter is determining whether the bridge was built during the period of significance.  Separating substructure from superstructure allows consideration of construction events and structures that may be different over material, design, and time. It avoids conflating both sub-and super-structures into one potentially dis-unified whole, where we are forced to dismiss abutments and piers that might be wholly consistent with local materials, construction, vernacular design, etc. because the overlying superstructure is relatively modern and not in local harmony, having been imposed as part of actions wholly outside of the local landscape.

The downside of the approach outlined here is one of information and knowledge, specifically the work required to obtain the information and knowledge to put each bridge through this 3-part analysis. Presuming we understand we have a rural historic district present and know for what it is significant (a big presumption), we still must figure out whether the crossing is on a principal roadway, and whether the substructure and superstructure are part of the important story that this Landscape tells.

Next: Part III

Rural Agricultural Landscapes – Part I

Rural Agricultural Landscapes and the Bridges Therein

Pennsylvania is a large and old state with a sizeable agricultural presence, and loads of older bridges that connect these farms to market. As PennDOT attempts to maintain its infrastructure, the need to address these rural bridges is clear, but as historic resources they can be important not only individually, but as contributing to a larger rural historic landscape.  This blog explores some of the issues related to considering rural historic landscapes (RHL) within the National Register, and how to parse out whether a rural bridge should be contributing or not contributing to that RHL, i.e., a large historic district.  As a historical note, this was and I believe still is a live issue between PennDOT and FHWA, and the SHPO, which started over a woodlot up in Centre County.  Although this discussion is focused on bridges and eastern rural historic landscapes, I think there may be some larger generalizations that can be drawn. Enjoy.

One of the partnerships that PennDOT, FHWA, and the SHPO entered was in the creation of a statewide rural agricultural context.  Pennsylvania was and is an agricultural state, with agriculture and its associated industries provide a $135.7 billion annual economic impact, representing close to 18% of Pennsylvania’s gross state product. This massive multi-year effort was led by Dr. Sally McMurry, a Penn State History Professor with special expertise in the history of agriculture.  She divided the Commonwealth into 16 distinct regions, each with its own agricultural signature.  Dr. McMurry and the SHPO then developed Registration Requirements for both farmsteads and (smaller) rural historic districts, which form the Multiple Property Documentation Form (MPDF).

http://www.phmc.state.pa.us/portal/communities/agriculture/index.html

This MPDF has been in operation since 2012 and as would be expected from a MPDF has provided a roadmap to assessing eligibility, especially in application to individual farmsteads. It gives some guidance on how rural historic districts could be considered under Criterion A. (McMurry 2012a, 2012b). The MPDF describes a historic agricultural district as “a group of farms, which share common architectural and agricultural landscape features; are linked together by historic transportation corridors… and together express characteristic features of local historical agricultural patterns.”  Registration Requirements statewide for Criterion A, Agriculture notes the following for individual properties:

…Criterion A significance should be assessed in relation to how a given property typifies a farming system, not in relation to whether a property is exceptional or unusual. A property should exemplify a farming system in all its aspects.  The totality of a property’s representation in the areas of production, labor patterns, land tenure, mechanization, and cultural traditions will determine its National Register eligibility. (McMurry 2012b Section F:1)

Characterizing a Landscape

Unfortunately, the MPDF is better developed for individual properties or what appears to be McMurry’s conception of an archetypical district, i.e. a group of farms clustered together.  When considering a rural historic landscape, however, a different set of rules may be needed.  The National Register defines a Landscape as:

a geographic area that historically has been used by people, or shaped or modified by human activity, occupancy, or intervention, and that possesses a significant concentration, linkage, or continuity of areas of land use, vegetation, buildings and structures, roads and waterways, and natural features. (p. 3)

Eleven characteristics have been developed for “reading” the Landscape and understanding the forces that shape it – four of the characteristics are processes; the remaining seven are physical components.   The processes link to the physical components to form a unified whole (p. 4). 

The process of evaluating Landscapes entails “three major activities: defining significance, assessing historic integrity, and selecting boundaries” (p. 12).  Furthermore, “significance, integrity, and boundaries depend upon the presence of tangible landscape features, and the evidence of the processes, cultural and natural, that have shaped the landscape” (p. 12).

Can we build on McMurry’s work to scale up what is defined as a rural historic district or further to a Landscape?  It is reasonable to use the same Criterion A significance statement as the Registration requirement.  [Obviously, there are 3 other main Criterion for significance than A, but this is our starting point.  Perhaps at a later date, we can review RHLs under the other three frames.]  The MPDF defines a farming system as the framework for understanding how agriculture in Pennsylvania evolved, each agricultural region containing a distinctive evolutionary trajectory for a farming system, with its own chronological development and distinguishing characteristics.  In the same way that individual farms or McMurry’s district could express the farming system in its region, a Landscape could also express the region’s evolutionary trajectory, or story.

Significance

The majority of rural historic landscapes that would be considered here are significant for agriculture, under Criterion A (See p. 21 for Areas of Significance for Rural Landscapes). Significance for a Landscape under Criterion A is understood within the historic context of the region’s farming system trajectory through its landscape characteristics.

Many rural properties contain landscape characteristics related to agricultural land uses and practices. Eligibility for significance in agriculture on a local level depends onseveral factors:

  • First, the characteristics must have served or resultedfrom an important event, activity, ortheme in agricultural development as recognized by the historic contextsfor the area. 
  • Second, the property must have had a direct involvementin the significant events or activities by contributing to the area’s economy,productivity, or identity as an agricultural community.  
  • Third, throughhistoric landscape characteristics, theproperty must cogently reflect the period of time in which the importantevents took place. (McMurry 2012b:13)

When working within the MPDF, importance often hinged on productivity measures, i.e., was the farm successful.  In the frame of a large rural historic landscape, is that even a useful measure?  And if not, what would be?  

The basis for significance for the farmstead is whether the production values were above average. This doesn’t really work in evaluating rural historic landscapes, but there may be a surrogate methodology that compares one valley against the next in terms of prosperity.  When looking at a landscape as a potential historic rural agricultural district, if we bring forward the notion of the district as as system, then we can open a door to surrogate measures of prosperity.  One is the richness of functions within the (agricultural) system.  Does it have a grange, a general store, a mill, a saddlery, churches, a hotel?  Is there a hierarchy of settlement within the district, i.e., does it have a village or town as well as crossroads communities?  We would expect that the more prosperous historic districts would have these features and that the less prosperous ones have a stripped down functional environment, maybe reduced to single farms and a mill.  It may be possible to set registration requirements for different landscapes within each of the agricultural regions and within each time period, to compare in a more effective and quantitative way one landscape to the next.

Integrity

McClelland, et al (n.d.) offers a reasonable and useful approach to assessing historic integrity (pp. 21-24).  For rural agricultural landscapes, qualities of location, setting, and design are less likely to be affected by modern development, although design could be significantly altered by modern agricultural practices.  Comparsions of modern and historic aerial photography can provide clues as to whether a landscape has undergone significant transformation.

Materials and association could also be vastly different from the period of significance especially if the farming systems have radically changed.  In fact, the trajectory of the history of farming in Pennsylvania is one of several major transformations statewide, from regionalism and the local mix of crops and husbandry, to a 20thcentury modernization and homogenization and pull toward external markets, to an ever increased specialization and concentration as farms become less self-reliant for animal feed, pasture, fertilizer, and family provisions.

And of course, development in the form of farms subdivided for housing, resource extraction (such as natural gas), public utilities, and other industrial development can also diminish historic integrity.  At the end, the landscape has the same challenge that smaller rural historic districts have. Can it retain the general character and feeling for its period of significance?

Next: Part II

Bibliography

McClelland, Linda Flint, J. Timothy Keller, Genevieve P. Keller, and Robert Z. Melnick

n.d.              Guidelines for Evaluating and Documenting Rural Historic Landscapes. National Register Bulletin 30. U.S. Department of the Interior.

McMurry, Sally

2012a          MPDF Introduction and Overview. Agricultural Resources of Pennsylvania, c.1700-1960.  Multiple Property Documentation Form, U.S. Department of the Interior.

2012b          Agricultural Resources of Pennsylvania, c.1700-1960. Multiple Property Documentation Form, U.S. Department of the Interior.

Sebastian, Lynne

2004            What is the Preservation Payoff? Remarks presented in a session entitled An Alternate View of the Section 106 Review Process, Appendix D, A Working Conference on Enhancing and Streamlining, Section 106 Compliance and Transportation Project Delivery, Santa Fe, NM February, 2004. SRI Foundation

U.S. Department of the Interior

1991a          How to Apply the National Register Criteria for Evaluation. National Register Bulletin 15. U.S. Department of the Interior.

1991b          How to Complete the National Register Registration Form. National Register Bulletin 16A. U.S. Department of the Interior.

The PennDOT and IUP Partnership: A Personal History – V

The PHAST and the PHURIOUS: The Third IUP Contract (2007-2012)

In the fall of 2005, IUP floated a proposal to begin a Master’s Degree in Applied Archaeology.  In July, 2007, MOU 430647 for collections processing expired; however, the work had not yet been completed, given the vast number of collections still needing processing.  Both PennDOT and IUP felt that the partnership was worth continuing, for the collections processing, the Byways to the Past Conference and associated publication series, and the other possible joint activities.  On August 27, 2007, another 5-year MOU (431034) was executed. This time the collections processing was folded into the main MOU and going forward from 2007, PennDOT and IUP operated under a single MOU.

Beginning in early 2007, we began discussing a new way to conduct geomorphological studies.  Geomorphological studies would be conducted prior to an archaeological investigations so that we could confirm that any floodplain was stable and not active during the period of human occupation.  If we could determine that the floodplain was active, then there was no need for further archaeological study as there would have not been a stable land surface for archaeological deposits.

While this was good in theory, the economics weren’t necessarily practical.  Keeping in mind that most applications of this pre-archaeological work would be for bridge replacements in a limited footprint, it still cost upwards of $10,000 to conduct and had maybe a 50-50 chance of eliminating the need for an archaeological investigation that would cost in the neighborhood of $12,000-20,000. The high cost of geomorphology was linked directly to the design consultant bringing in a subconsultant specialist, with the prime’s overhead and profit.  Was there a way to cut the middle man out?

Indeed there was.  At that time, one of the foremost geomorphologists working in Pennsylvania was Frank Vento, who was a professor at Clarion University, also a State-Related University and therefore a state agency.  As an experiment, IUP added Dr. Vento to the IUP agreement, essentially hiring him, for the purposes of conducting geomorphological studies.  That opportunity came at Hunter Station in 2008, and demonstrated proof of concept.  We then turned around and created an MOU with Clarion University and Dr. Vento to conduct geomorphological studies going forward. Our partnership with IUP and the existing MOU permitted this proof of concept to be tested with little effort. At that time, IUP did not have a geomorphologist on staff, so there was no conflict over activities, and the task assignment did not diminish our active list of projects with IUP.  Over time, the Clarion University MOU proved to be enormously cost-effective, providing studies at approximately $2,500 each. Having a cost-effective solution for conducting geomorphology really opened this technique as a tool for our staff archaeologists, making its use much more common.

2008 brought changes to the Byways to the Past Conference. 2007 would be the last year that the Byways Conference would be held on the IUP campus, and as an explicit task assignment through the MOU.  By 2008 it was felt that the remote location of the Conference was a barrier to bringing more people together.  That year the Conference was successfully held in Harrisburg, demonstrating that the Byways Conference could be held outside of IUP.  Attendance from 2007 to 2008 was up 80% and costs were down, as (free) Commonwealth venues were selected.  The story of the Byways Conference after 2008 is worthy of its own story, full of drama, intrigue, treachery, and state government at its most incompetent.  I will leave that story for another day, largely to protect the guilty.

In 2009, IUP conducted a Phase I archaeological survey for a Wetlands Bank in Greene County.  This was unusual as generally we would have archaeological surveys conducted and paid for by the projects through the prime engineering design firm and subconsultants.  In this case, the proposed bank was not yet a programmed project, but there was a need to determine whether the proposed wetland site contained archaeological resources. If it did, the bank would be designed around the resources.  If the resources were large enough, the entire site might be abandoned as a banking location.  This was an opportunity for Central Office to perform a favor for the District by absorbing the costs of the archaeology, and more importantly, by providing the contracting instrument to get the work done.

Coincidentally, in 2009, IUP finally launched its Master’s in Applied Archaeology Program, and in the following Spring PennDOT launched the PHAST program – PennDOT Highway Archeological Survey Team.  The concept, developed by Joe Baker, paired an advanced graduate student from the MA program with 3 IUP summer interns and a cultural resources professional (CRP) archaeologist provided by PennDOT. (Note that by this time, the descriptor QP had been supplanted by CRP so this terminology will be carried forward.)  This IUP team of 4 would be scheduled around the state to conduct quick-hit archaeological surveys, mostly Phase I’s and small Phase II’s, under the direction of the CRP.  The advanced graduate student would serve as field director over the interns and under the CRP, who would oversee the work and sign off as principal investigator. Angela Jaillet-Wentling was the first field director.  Roughly 15 projects were completed in that first year, 2010.  After a fashion, PennDOT finally had its own in-house archaeology program.

I bear the responsibility for this not happening sooner, and I certainly had my reasons.  In my prior job at the Maryland State Highway Administration, I oversaw both the management of archaeological consultants and the conduct of archaeological studies by my staff for SHA. These were often in conflict as projects needed to get done regardless of who did them and there simply wasn’t enough time to both manage the consultants, review their work and reports, and simultaneously conduct archaeological surveys, analyze the results and write the reports.  To make matters worse, there was project creep as the Project Managers thought we could conduct larger and more complex field projects each time.  I vowed that at PennDOT we would not make the same mistake and discouraged any attempt to set up a program for the conduct of archaeology in-house.  Joe Baker, who had come from the Commonwealth Archaeological Program (CAP) within the SHPO, had both the skill and inclination to continue to conduct archaeological studies, as did most of the staff archaeologists, as do most archaeologists in general.  It is the old definition of the profession, “Archaeology is what archaeologists do.” In a catch as catch can manner, some of the CRPs did do archaeology for their Districts, but never officially sanctioned by me or Central Office.  It provided some friction, and until the PHAST program emerged, no real resolution in the conflict.  What finally swayed me was the fact that the proposed program was well-defined and limited in scope.

The mutual benefits of the PHAST program were immediately recognizable.  First, PennDOT got over a dozen projects a year completed at a fraction of the cost from by our regular design consultants and subconsultants.  We were saving $250,000 a year.  Secondly, it benefitted the IUP MA program by giving a student hands-on experience supervising crew, which is not only an important skill set for becoming a professional archaeologist but also is one of the requirements for meeting the Secretary of Interior Standards for a professional archaeologist.  It cannot be taught in the classroom.

IUP gained a useful lab for training its students.  As a state-related institution, IUP is also measured on how well it partners with other state agencies. The partnership with PennDOT clearly helped the Anthropology Department in street cred. And not insignificantly, the paltry (paltry when compared to contracting with private consultants, for sure) sums PennDOT paid IUP in overhead was hard currency in a university that counts its pennies.

PHAST fed and sustained our summer intern program, ESTI (Engineering, Scientific, and Technical Interns) sponsored by PennDOT. In a way, the interns provided to PHAST were free even though they were paid, and paid well I might add. ESTI interns made roughly $4 an hour more than regular students on campus.  The budget to fund ESTI came out of a different budget from ours, so we were literally using other people’s money, even though it was all PennDOT.  The field director’s salary and budget came out of the IUP MOU, so those individuals worked for IUP while the interns and Principal Investigator worked for PennDOT. Field and travel expenses for the field director was picked up by the IUP MOU, but travel expenses for the PennDOT-paid interns was covered by PennDOT.  Administratively, the arrangement was more than complex.  Joe Baker supervised the program, but as he was not classified as a supervisor, he could not technically supervise the interns, which involved matters of signing travel expense vouchers and time sheets. I picked those up during the Summer, as well as officially supervising the other interns working with the PHMC. 

The 3 PHAST student interns gained real on-the-ground field experience for the summer, again another valuable skill that is also captured in the Secretary’s Standards.  In addition, when these students could find their way to Harrisburg on a Friday, Joe Baker would add them into the seminars he gave to the other class of interns during the summer.  It was an enriched cultural resources management education.

The PennDOT ESTI program ostensibly exists as a recruiting tool for future PennDOT engineers.  We in the cultural resources unit would routinely laugh when talking about that aspect of the intern program, but perhaps the laugh was on us. Since cultural resources started working with the intern program, we have hired 3 cultural resources professionals that were former interns, including one who was the PHAST field director. In addition, a number of IUP graduates of the MA program who had worked for us as interns through PHAST are now working for our consultants and sometimes working directly for our office.  So in the end the intern program seems to be doing what it was intended to do.  And to vindicate Joe Baker’s arguments for setting up an internal field program, the Federal Highway Administration saw fit to award the PHAST program an Environmental Excellence Award in 2017.  This prestigious national award is given out every other year to about 12 projects or initiatives. In the history of the program, spanning 20 years, PennDOT has won 5 times, this being the latest.

2010 also brought PennDOT two major changes to its program.  First, the Minor Projects Programmatic Agreement that was signed in 1996 was supplanted by a revised and expanded Programmatic Agreement, which further delegated responsibilities to PennDOT CRPs and District Designees.  Secondly, PennDOT in partnership with Preservation Pennsylvania launched Project PATH, which became our online site for Section 106 consultation. I mention Project PATH because IUP played a key role in its implementation.  A premise of Project PATH was that all supporting documents would be publicly available in close to real time.  This meant the web platform was simpler and transparent.  However, it also meant that archaeological reports couldn’t be housed there.  Archaeological reports often have sensitive information and this information, primarily site locations, is specifically exempted from the Freedom of Information Act. We still needed to be able to share these reports with the SHPO and certain consulting parties and Federally recognized Tribes, and relying on a paper environment betrayed the non-print philosophy behind the Project PATH site.

IUP came to the rescue (again).  The offered up an FTP server for our use, on which we housed our sensitive archaeological reports in a secure password-protected manner. We registered and provided access and passwords to those consulting parties that needed the information.  In that way, we essentially kept two platforms going simultaneously, one fully public, and one (sensitive) that was fully private.  Section 106 work in mysterious ways, and IUP’s assistance was invaluable in getting the full solutions to electronic Section 106 launched.  IUP provided that service until 2017 when PennDOT developed and promoted a Microsoft Sharepoint environment.  At that time, IUP students helped us migrate all of the reports over those 7 years onto that new platform.

Next: Steady, Podner, Steady: The Fourth and Fifth IUP Contracts (2012-)

The PennDOT and IUP Partnership: A Personal History – IV

Legacy Collections without End: The Second IUP Contract (2002-2007)

2002 was going to be a year of change for PennDOT.  In May, the first IUP agreement was going to expire. In August, PennDOT’s commitment to hire on the 5 IUP QPs was coming due.  Although it might seem to the uninitiated that bringing 5 state employees from one agency to another would be a simple matter, that couldn’t be further from the truth.  For one, there was never a commitment from PennDOT to hire the actual individuals from IUP into the PennDOT fold.  The commitment was to give the IUP QPs an opportunity to apply to the PennDOT positions being created.

Given that there was a gap between the expiration of the May IUP agreement and the August PennDOT hiring commitment, we created a bridging agreement (MOU 430636) that covered that time frame.  Basically, the MOU extended the IUP Agreement long enough to complete the PennDOT hiring process, which began that summer.  By the end of August, all but one of the IUP QPs had been brought over to PennDOT as permanent employees, and by September 9th, the last PennDOT committed position had been filled. During this time, moving the agreements through signature was a somewhat harrowing experience as we met deadlines often by a matter of days.

Whither our relationship with IUP?  In theory, it could have ended with the hiring of the IUP QPs into PennDOT.  Instead, as 2002 unfolded, it became apparent that there was value in keeping the IUP partnership going.  For one, the two Byways to the Past Conferences held in 2000 and 2001 were successful and suggested they be continued.  Secondly, we needed an outlet for both popular and technical publication of our advanced studies and archaeological data recoveries.  The first publication on the King of Prussia Inn was successful, but were difficult to produce.  For some reason, PennDOT does not think of itself as a publishing house.  We needed support.  

Finally, it was becoming apparent that many of the archaeological projects completed by PennDOT since the early 1980’s had never been submitted to the State Museum.  There had not been a consistent policy in place at PennDOT to mandate the submittal of collections upon completion of analysis and for various reasons they were abandoned to the contractor.  Prior to 1999, adverse effects to archaeological sites were seen as not adverse in the eyes of Section 106 as long as a data recovery was conducted. This meant that none of these projects had associated MOAs or PA’s, which would have spelled out curation requirements.  Secondly, PennDOT budgets for archaeological work were set prior to the start of excavations.  If more fieldwork was needed, the Project Managers would instruct the archaeological firm to keep digging, but pay it out of artifact processing and report writing. Sometimes, at the end of the final report, there were no funds left to prepare the collections for curation or pay the curation fee.  Sometimes, there wasn’t money left to prepare a final report, but that was “OK” as long as the draft report was accepted by the SHPO and the project proceeded. Inevitably, once the project went to final design and was built, the project line item was closed, meaning there was no funding source to clean up loose ends.  More complicated data recoveries often took years to finish, well beyond the ribbon cutting date.  Most of the time, the consultant was left holding the collections, sometimes for decades. We thought that Archaeological Services at IUP could help us in this regard by cleaning up those old legacy collections.

With these ideas in mind, we worked with IUP to create an MOU to replace MOU 430636.  MOU 430639 was executed July 29, 2002 and while it did not provide PennDOT with QPs, it did provide other services over the next 5 years.  Ironically, one thing the MOU did not provide was training to PennDOT during that period – IUP’s roots are as a teacher’s college.  Due to the silo mentality found in state institutions, the Commonwealth of Pennsylvania had chosen to siphon off anything that might remotely be considered training into its own unit, to be managed by the Office of Administration and the Bureau of Human Resources.  Had we chosen to leave training in the MOU, the agreement would have had to be reviewed by both of those offices, on their own timetable. We could have taken the more traditional approach within PennDOT and have called training “familiarization” but that seemed more of a risk than we were comfortable with and our deadlines in 2002 were fierce indeed.

In December, the first fruits of our efforts began to appear.  Two recent archaeological studies, at Gayman’s Tavernand Mansfield Bridge, were considered worthy for popular publication as we continued the Byways to the Past Series begun with the King of Prussia Inn.  The consultants that conducted the studies and wrote the technical reports prepared the text and images for the popular booklets. Joe Baker would inevitably badger the authors and/or rewrite material himself to get it into popular form.  We both agreed that there is something about archaeologists that precludes writing for the public.  My own theory is that we like to work with dead people because they never talk back.  Communicating with the living is another matter, as we are all just versions of Sheldon Lee Cooper.

That same month, PennDOT issued a task assignment for the production of a compact disc on the results of the Oberly Island Excavations.  Grey literature has been a chronic problem in archaeology going back decades.  Final technical reports might have only one or two copies, which would be kept in either the SHPO’s office, or at Temple or Pitt. Even the existence of these reports was not widely known and at the time electronic versions were completely unknown. The use of compact discs to disseminate important data recovery reports was for us an advance, and was becoming more common across the country. Today, we expect to download this information from web sites or to our phones, but I would like to remind folks that in 2002, the World Wide Web was a teenager, and that iTunes had not yet been launched as a service.   Over the years, IUP produced a number of CDs on our more important projects, which have been distributed to the professional community.  As the capability to download these large technical reports is now with the CRGIS, PennDOT’s CD business is rapidly coming to an end.  The remaining CDs are being distributed at statewide professional meetings, or being used as drink coasters.

Also in December, we executed a task assignment for IUP to begin processing these older abandoned collections.  When collections had been halted in processing, they may have been washed; many had not.  They may have been cataloged, but some had only the catalog sheets from the original inventorying.  Many had not been labeled or re-bagged in clean and durable polyethylene bags for long-term storage.  And certainly, none of the collections had been submitted with the curation fees that would have been owed.  A brief digress here.  Curation fees is a bit of a misnomer.  The State Museum policy was to actually curate the collections without charge; however, the process of accessioning them was costly and those costs needed to be recouped.  Accessioning included checking collections against the submitted catalogs, making sure the materials were properly labelled and bagged, and that they were in suitable acid-free containers.  When the gap between the actual and promised state of the collection was small, the State Museum staff would make up the difference, labelling and bagging as necessary, rather than returning the collection back to the firm to be redone. Accessioning was an extended quality control process and labor intensive.  The fees charged for collections under the flag curation were really accessioning fees.

Having IUP process these collections was a very good fit for us.  IUP already had an operational laboratory that was being used for Archaeological Services work.  Archaeological Services could provide the technical oversight in directing the laboratory.  Finally, there was  a pool of anthropology students who could work on the collections part time.  One of the eternal truisms of life is that student labor is cheap labor, so we were able to process the collections at a fraction of the cost it would have taken the archaeology firms who originally generated them.  Working closely with the State Museum, we were able to establish under which standards collections would be processed, given that some collections were at that time 20 years old and standards had changed.  By processing collections to current (2002) standards, the State Museum was willing to waive the curation fees, which would have amounted to tens of thousands of dollars. In July 2003, after finally acknowledging the full extent of the problem, PennDOT executed a separate 4-year $450,000 MOU (430647) with IUP for processing these collections. The entire legacy collections program was managed by Chris Kula, start to finish, through this and subsequent contracts.

As MOU 430639 progressed through the early 2000’s, PennDOT and IUP took advantage of the flexibility written into the MOU to conduct the following varied tasks:

  • Graphic support for the 2003 Tribal Summit.
  • Supporting Project Archaeology, which was a program to train teachers and professionals on how to develop public outreach materials, especially our Byways publications.
  • Supporting the input of data into the CRGIS.
  • Conducting research on the archaeological aspects of farmsteads, which would complement the above-ground research for the agricultural context study.

Next: The PHAST and the PHURIOUS: The Third IUP Contract (2007-2012)

The PennDOT and IUP Partnership: A Personal History – VI (Conclusion)

Steady, Podner, Steady: The Fourth and Fifth IUP Contracts (2012-)

On February 10, 2012, PennDOT and IUP renewed the partnership with another 5-year MOU (20120112).  In most ways, this MOU mimicked previous ones in terms of scope, but added more formally a geomorphology component and a geophysical testing component.  The geomorphology component was added to provide additional flexibility in choice of geomorphologist, in particular since Dr. Vento was particularly busy with PennDOT and other agency studies.  IUP agreed to add additional geomorphologists to the Agreement with subcontracts.  The geophysical component was new and rather exciting.  As a feature of IUP’s Anthropology program, faculty and staff had acquired both the machinery and skill to conduct magnetic resistivity, ground penetrating radar, and other remote surveying technology.  GPR was particularly useful for identifying cemetery situations and also buried historic archaeological foundations.  We at PennDOT would not have been able to maintain the equipment and skill set on our own.

For the five years of this MOU, the chief focus of activities was on the PHAST program, geomorphological studies, and winding up the collections backlog.  This period of the MOU was one of refinement and adjustment rather than innovation, as we perfected the PHAST program and managed the geomorphological assignments. The curation backlog was largely completed by 2012, but inevitably we kept uncovering old collections that had been missed in the original survey of outstanding collections.  As our goal was to completely bring the older collections up to date and submitted to the State Museum, we continued to make adjustments in task assignments, largely wrapping up activities in 2013.  Later we discovered that the Blue Route Collections, from the 1980s were still not processed. It was a large collection and we have since managed to put our arms around that problem working with Engineering District 6-0.

In 2017, we renewed the MOU again for another 5 years (MOU 201721), largely keeping the same terms and goals as MOU 20120112. This is the current MOU with IUP as of this writing (2019).  As with the previous MOU, the current MOU is also one of adjustment and refinement on the tasks assigned, which are primarily the PHAST program and geomorphological studies.  The Byways to the Past Conference, in its current form as part of the Statewide Heritage Conference, has been taken over by Preservation Pennsylvania, and is no longer a responsibility of IUP.  The collections backlog program – it is worthy of the title “program” given the length of time it lasted and the total number of collections processed – had been concluded.  Byways to the Past booklets are continuing to be published, and IUP remains the publisher of last resort, after first having the consultant be responsible for printing, and then considering PennDOT’s Graphic Services Unit to complete the printing. The CD series is coming to a close, as technological advances now permit these reports to be housed within the CRGIS as downloads.  The IUP Agreement continues to be available for special assignments and is used for such. In addition, PennDOT’s cultural resources unit continues to send a representative to IUP annually to participate in the review of the MA program.

Lessons Learned from this Partnership

I will be participating in a roundtable on university partnerships at the Society for American Archaeology Meetings coming up in April.  It is fair to ask with the distance of time whether there is anything to be learned from this particular partnership over the last 20 years?  I had a front row seat at all of this and often was the individual making key decisions on strategy and direction, so you would think this would be easy.  It is not.  The simple route would be to create a totally revisionist history where each decision and step was brilliantly thought out in advance, with long-term strategic goals, inevitably ending up where we are today, gloriously successful.  

It didn’t happen that way.

Having a front-row seat doesn’t necessarily give you perspective.  Furthermore none of us were hovering over our heads thinking about what we were thinking. We kept trying things until something worked, but didn’t spend time conducting a post-mortem analysis.  With the perspective of 20 years, I may be able to reconstruct what I felt and what I was thinking, but that doesn’t necessarily get you to interpretation and understanding.  I can more or less spell out the emic in this partnership game, but I may or may not be able to get to the etic, where we could more broadly talk about generalizations that might be applied to any partnership. Here goes.

First, just what is a partnership?  We can start with Merriam-Webster:

1: the state of being a partner : PARTICIPATION//scientists working in partnership with each other

2a: a legal relation existing between two or more persons contractually associated as joint principals in a business //began a legal partnership with his uncle

b: the persons joined together in a partnership //the partnership computes its net income … in a manner similar to  that of an individual— J. K. Lasser

3: a relationship resembling a legal partnership and usually involving close cooperation between parties having specified and joint rights and responsibilities //The band has maintained a successful partnership for 10 years.

That’s what I love about dictionary definitions. They always throw you deeper into the thicket.  Just what is a partner?

1:    archaic  : one that shares : PARTAKER

2a: one associated with another especially in an action : ASSOCIATE, COLLEAGUE//our military partners throughout the world

b: either of two persons who dance together

c: one of two or more persons who play together in a game against an opposing side //partners in card games

d: a person with whom one shares an intimate relationship : one member of a couple //Evan and his partner are going on a Caribbean cruise.

3: a member of a partnership especially in a business // partners in a law firm also  : such membership

4: one of the heavy timbers that strengthen a ship’s deck to support a mast —usually used in plural

Now, we’re getting somewhere. I actually like all of these definitions and I think all are relevant.  A partnership is a sharing relationship.  Each party needs to feel that it is getting something out of the partnership.  Partnerships are like a dance or a game, which is to say that they are not static relationships.  Partnerships are always in motion because nothing ever stays constant.  Working in state government, I also think of partnerships as playing against an opposing side, trying to make something work against the inertia of governmental mediocrity.  Even definition 4 is relevant. Partnerships need to do things, whether it is to support a mast so the ship can sail, or support a program so it can fulfill its mission.

Partnerships solve problems. Yes, the first rule of seeking a partnership is that one is needed to solve a specific problem.  Not all problems are solved with a partnership, but a partnership in search of a problem is in trouble out of the gate.  Sometimes the problem is concrete, such as how to staff a new program. Sometimes the problem is more abstract, such as building credibility in the larger preservation community.  It can even be the need for constant improvement.  Edward Deming is the founder of the Total Quality Movement, which in the 1950’s brought Japanese manufacturing back into prominence, and has influenced business thinking in the US for decades. His 14 points are worth restating here, and they were on my cubicle wall during my entire career at PennDOT:

  1. Create constancy of purpose toward improvement of product and service, with the aim to become competitive and to stay in business, and to provide jobs.  
  2. Adopt the new philosophy. 
  3. Cease dependence on inspection to achieve quality. Eliminate the need for inspection on a mass basis by building quality into the product in the first place. 
  4. End the practice of awarding business on the basis of price tag. Instead, minimize total cost. Move toward a single supplier for any one item, on a long-term relationship of loyalty and trust. 
  5. Improve constantly and forever the system of production and service, to improve quality and productivity, and thus constantly decrease costs. 
  6. Institute training on the job. 
  7. Institute leadership. The aim of supervision should be to help people and machines and gadgets to do a better job. 
  8. Drive out fear, so that everyone may work effectively for the company. 
  9. Break down barriers between departments.
  10. Eliminate slogans, exhortations, and targets for the work force asking for zero defects and new levels of productivity. Such exhortations only create adversarial relationships, as the bulk of the causes of low quality and low productivity belong to the system and thus lie beyond the power of the work force. 
  11. Remove barriers that rob the hourly worker of his right to pride of workmanship. The responsibility of supervisors must be changed from sheer numbers to quality. 
  12. Remove barriers that rob people in management and in engineering of their right to pride of workmanship. This means, inter alia, abolishment of the annual or merit rating and of management by objective. 
  13. Institute a vigorous program of education and self-improvement. 
  14. Put everybody in the company to work to accomplish the transformation. The transformation is everybody’s job. 

Number 5 is central to developing partnerships:  Improve constantly and forever the system of production and service, to improve quality and productivity, and thus constantly decrease costsThe need for quality improvement cannot be achieved only by relying on internal resources in the work unit.  I would argue that you cannot substantially improve a process or overall quality without engaging in partnerships.  

In government, there is a natural tendency to stay in our lanes, to stay in our silos.  Government is built for inertia.  My first problem was that I couldn’t stand the notion of staying in the work situation outlined in Part I of the series.  The very first partnerships formed in cultural resources were with the SHPO, in the form of a programmatic agreement to move us past the shoveling of dubious documents to another desk for approvals.  In 1997, we had a problem with not having long-term staffing to support our newly minted programmatic agreement.   We thought that IUP had the best ability to create staff, and as a university had the stability to honor a long-term commitment.

Seek best fit through mutual benefit.  As clichéd as it may be, you can’t have a partnership without partners, but some partners are better than others. In approaching potential partners, it was necessary to visualize how the partnership would benefit them and to communicate that vision.  Otherwise, why would the other party give you the time of day?  IUP also had a problem to solve.  They are a state agency and have a mission to provide assistance to other state agencies.  They need to be relevant in today’s world, not just the Academy.  Evidence of that need was the existence of Archaeological Services.

Partnerships take time to build.  Our first meeting with IUP was in the Fall of 1997. The first MOU was executed May, 1999, almost 2 years later.  Actually that was rather fast.  Other partnerships we had usually took 3 years.  Never expect to be able to enter into a partnership (at least not a meaningful one) quickly.  Think about it.  You have two different institutions, each with its own management and administration, rules, lawyers, etc.  Each institution has to move outside of its comfort zone, and regardless of how often or how loud management says it is 100% behind innovation or whatever the current best new thing is, they usually don’t mean it.   After going through Graduate School and working with IUP and other universities for nearly 40 years, I can safely say that universities are every bit as bureaucratic and administratively difficult as PennDOT.  The only difference seems to be in the mission.  At any number of occasions, I could have legitimately given up on the partnership as being simply too hard to execute.  So could Bev Chiarulli, Phil Neusius, and the Anthropology Department.  Commitment, constancy of purpose, and useful streaks of stubbornness brought us through.

Real partnerships add value. In building a partnership, we had to find a way to make 1 + 1 = 3, to create value out of the partnership that transcended the simple transactional nature of the MOU.  At first, the added value was quite abstract, and the transactional nature of the MOU was right in front of us.  Find and rent us QPs and we will pay you.  As we crafted the MOU though, we made sure that the terms would allow us to engage in other mutually beneficial activities.  One of the first was the joint Byways to the Past Conference held in 2000 on the IUP campus in the newly built Eberly Business School facilities. Benefits accrued to PennDOT for hosting a transportation conference, but also to IUP for same. In addition, IUP’s Anthropology Department could show to the Dean and Administration that it was working to serve another state agency, bringing in a little money as well, and furthering IUP’s educational mission.

The Second MOU, sans QPs, also created value, especially in the conduct of the legacy archeological collections project.  This employed IUP students giving them hands on experience working with collections. It kept IUP’s lab busy, and Archaeological Services billable and important.  PennDOT got necessary work completed at a fraction of the cost we would have incurred had we gone the private consultant route.  Again, 1 + 1 = 3.  This was repeated with the Third MOU that brought geomorphological services and PHAST to the table, and which was continued into the Fourth and current MOUs.

Partnerships transcend a business relationship. In building a partnership, it was important to find a way to let both partners feel that they were coming out ahead in the arrangement.   In building and maintaining any relationship, whether it be a marriage or a partnership between two agencies, the same key ingredients appear over and over again: honesty, trust, communication, commitment.  This is not surprising nor should it be.  With IUP, we met early and often, exchanged a lot of phone calls and e-mails. We wrote out drafts of terms for the MOU and other supporting documents.  Each of us had to work our management to sell the concept and get them on board.  

Once the partnership was in place, it required care and maintenance.  When IUP established a Master’s of Applied Archaeology Program, they invited us to sit on an advisory board to guide the program.  We jumped at the chance and never missed a meeting.  When I retired I made sure that there was someone in PennDOT who could continue.  When we did task assignments, sometimes there was advance coordination to check to see what IUP could manage within their schedule.  We wanted the assignments to be realistic and not onerous, a constraint we never applied to our engineering consultants.  When we were holding Byways Conferences, there was also intense coordination on the program, on logistics.  When the PHAST program was initiated, we reserved internships for IUP students, and we made sure that IUP students were considered for other internships in Harrisburg.  We cowrote press releases when good things happened and made sure to give IUP as much credit on any success as we could manage.

Partnerships require adaptation.  Over time, the partnership has evolved and should continue to do so.  The types of ventures we undertook changed over time as our mutual needs and abilities changed.  Our first MOU was for staff, plus some extras. Without the need for staff, the MOU evolved into other mutually beneficial initiatives, such as the legacy archaeological collection project.  As geomorphology became are more important tool in our project studies, we managed to work that into the MOUs.  Thankfully, we had the time to process changing circumstances and make necessary adjustments.

Timing and opportunity matters.  Guy Raz has a podcast on public radio called “How I Built This, with various entrepreneurs being interviewed on how they built their businesses.  One of the best questions comes at the end, when Guy Raz asks each one how much of their success was based on skill and work and how much on luck. The answers are fascinating.  I think the same question can be asked here.  

I know for a fact that my staff and I and Bev Chiarulli, Phil Neusius, and folks at the Anthropology Department worked very hard over the years to build this partnership and to sustain it.  But I also know that a lot of people in PennDOT and in other cultural resources units also work equally hard or harder.  And I consider myself a good salesman, but there are also many who communicate as well or better.  Hard work alone doesn’t result in a partnership.  You could say that luck also played a part, but what I would call luck is having the door open at times.  When I came to PennDOT, my supervisors and managers, including Wayne Kober and Dan Accurti, were receptive to change and new ideas.  It was most visible with the EMS re-engineering, where management, especially M.G. Patel, the Chief Engineer, actually sought out useful change.  Our timing was excellent, as we had just executed the new programmatic agreement and were looking for ways to implement it.  

You don’t get a chance to pick your managers or the timing of these agency-wide initiatives, but you also have to recognize when the opportunity exists and that the door is open.  As stated earlier, working in government means that there is always a Department-wide initiative to increase productivity.  Some are serious, but most are flavor-of-the month management speak. In an advanced seminar, we could teach you tools on how to tell the difference, but let it suffice that it is critical to know the difference before investing the work that would be required to actually produce a partnership.

Lefty Gomez once said, “I’d rather be lucky than good.” He also said his success was due to clean living and a fast outfield.  So to my fast outfield of Kula, Russell, and Baker, I close with a sincere thank you.

The PennDOT and IUP Partnership: A Personal History – III

Part III – And Away We Go: The First IUP Contract (1999-2002)

In the summer and fall of 1997, we began a series of outreach efforts with various Pennsylvania universities.  Other than IUP, none (and I include our land grant university Penn State in that none) were interested in partnering with us on this initiative.  On October 29, 1997, we met with a contingent from IUP which included Dr. Beverly (Mitchum) Chiarulli from Archaeological Services and Dr. Phil Neusius from the Department of Anthropology, Dr. Ginger Brown, the Associate Dean for Research for the Graduate School, and Evelyn Landon from the Institute for Research and Community Service.  Of particular interest was the 10-year track record of Archaeological Services that had provided archaeological studies and research to other Federal and State agencies. Archaeological Services was not an academic department but under Research and Community Services. Clearly, IUP knew how to work with other agencies. One final fact favored IUP. As state agencies, IUP and PennDOT could enter into memorandums of understanding without competitive bidding and with a relatively simple signature and legal review process, taking between 6-10 weeks from start to finish.  A sole-source or bid contract of comparable size and complexity would take anywhere from 1-2 years.

In this and other meetings through the winter of 1997-1998, we hammered out the framework for an interagency agreement, in which IUP would provide 8 archaeologists and architectural historians to implement our PA for a period of 5 years, renewable.  Concurrently, in the fall of 1997, we were also meeting with selected Engineering Districts to float the idea of regionalizing the positions, putting them in the Engineering Districts instead of Central Office BEQ.  Based on our experience with District 4-0 and Jamie McIntyre, it appeared that better use of the QPs could be made in the Engineering Districts, working side-by-side with the environmental team and design team. This was one of the other recommendations coming out of the EMS Re-engineering and went hand-in-hand with provisioning staff. As they say in Texas, “Go big or go home.”

By February, 1998, we had developed a Memorandum of Understanding between PennDOT and IUP which would add 9 staff to the program, augmenting the existing complement of 6 (Beckerman, Kula, McIntyre, Spohn, Anthony, and an architectural historian vacancy ultimately filled by Kara Russell). These 15 staff would be spread over 5 service regions and Central Office, but all field staff would be hosted by an Engineering District.  BEQ shifted its role from the fount of all things cultural to the main support unit, providing quality assurance, technology transfer, training, and outreach to the public.  You will notice the discussions over the winter of 1997-1998 were for 8 additional staff, but that the MOU presented to upper management was for 9.  One of the better ideas from Wayne Kober was to add one more staff member to the Agreement. This one position was not designated for direct project delivery, but for public outreach and other duties as assigned.

This MOU was presented in February to our upper management for funding and we received the go ahead to proceed. However, in March we were challenged by the Union representing cultural resources staff at PennDOT and at PHMC, the Federal of State Cultural and Educational Professionals (FOSCEP).  The grounds of the objection were twofold:

  1.  The agreement was not cost effective, as compared with hiring state employees within the Department.
  2. The work to be performed is traditional FOSCEP bargaining unit work, and should not be performed by another bargaining unit

Despite the fact that we were going to be utilizing state employees, and replacing consultants with state employees, apparently they were the wrong state employees, i.e., represented by a rival bargaining unit. Go figure.

By December, the issues with FOSCEP had been worked out. The MOU calling for 9 IUP positions was scaled back to 5 positions. Concurrently, the Department made a commitment to hire 4 positions initially, and then at the end of 3 years, absorb the 5 IUP hires into the Department, i.e., into FOSCEP.  On May 27, 1999, the 3-year MOU was executed.  The first year’s estimated cost (July 1, 1999- June 30, 2000) was $362,000 with an approximately equivalent budget for each of the next two years.  The MOU would expire on May 27, 2002 and the commitment to FOSCEP would expire on August 13thof the same year.  The initial hires by IUP were Scott Shaffer, Bruce Manzano, Jonathan Daily, Matt Hamel, and Joe Baker.  The first PennDOT hires under this arrangement were Monica Harrower, Kevin Simons, Zephreny Parmenter, and Joe Verbka.  The hiring process by IUP was much smoother than our PennDOT Bureau of State Employment procedures and they were on-board much more quickly.

In addition to the 5 hires, and associated technical and computer support, IUP also agreed to provide training on archaeology and historic preservation to all cultural resources staff in PennDOT, and to sponsor lectures, conferences, symposia, and other educational outreach activities related to cultural resources.  The first Byways to the PastConference was held at IUP at Eberly Hall on March 8-9, 2000 and co-sponsored by IUP, PennDOT, and also FHWA and the Turnpike Commission.  It focused on the intersection between transportation and historic preservation. Topics were wide-ranging as noted in the programs for the Byways Conference in Years 1 and 2:

First Byways to the Past – 2000

Archaeology

Varna Boyd (Greenhorne & O’Mara, Inc.) – The U.S. 219 Meyersdale Bypass Project: Contributions to the study of Monongahela Culture 

Gary Coppock (Heberling Associates, Inc.) – The Case of the Missing Hamlet: An inquiry into settlement, subsistence, and sociopolitical organization in the Upper Casselman Valley ca. AD 500-900 

Thomas C. East (Skelly and Loy, Inc.) – The Wiser Site: A Late Archaic stone bead manufacturing site in Central Pennsylvania 

Peter E. Siegel (John Milner Associates, Inc.) – The Oberly Island Site: Prehistoric Late Archaic/Late Woodland adaptations in the Lower Lehigh Valley 

Albert T. Vish (Skelly and Loy, Inc.) – The Tunkhannock Bypass: Recreating prehistory at the Harding Flat site 

Robert Wall and Hope Luhman (The Louis Berger Group, Inc). – Four Thousand Years of Tioga County Prehistory: The Mansfield Bridge site excavations 

Historic/Industrial Archaeology

Richard Affleck (URS Greiner Woodward Clyde) – At the Sign of the King of Prussia: Archaeology at the King of Prussia Inn, Montgomery County 

Ken Basalik and Jamie McIntyre (CHRS, PennDOT District 4-0) – The Lackawanna Valley Industrial Highway: A view from the anthracite fields Melissa Diamanti (Archaeological and Historical Consultants, Inc.) 

Melissa Diamanti (Archaeological and Historical Consultants, Inc.) – Weighing in on the Union Canal 

Vickie Kunkle (Gibson Thomas) – A Covered Bridge in Indiana County 

Richard Meyer (John Milner Associates, Inc.) – App’s Mill and the Replacement of Camelback Bridge, Penn’s Creek, Snyder County, PA 

Tom Riester (Mackin Engineering Company) – Rehabilitation of the Historic Smithfield Bridge 

Historic Preservation Projects and the Public 

Christine Davis (Christine Davis Consultants) – ISTEA & the Herr’s Island Bridge: Connecting an award-winning brownfield 

Eric Deloney (National Park Service) – HAER’s Historic Roads and Bridges Program 

Kevin Patrick (Indiana University of Pennsylvania) – Safe Highways to History: Interagency cooperation in the Lincoln Highway Heritage Corridor 

Ben Resnick and Diane B Landers (GAI Consultants, Inc.) – Erie Coastal Predictive Model 

Second Byways to the Past – 2001

Archaeology

Richard B. Duncan (Skelly and Loy, Inc) – Sites Are Where You Find Them: The Central Susquehanna Valley Archaeological Site Predictive Model 

Thomas R. Lewis (CHRS, Inc.) – The History of a Floodplain: The Pennsylvania Turnpike Bridge over Yellow Breeches Creek 

Patricia Miller (KCI Technologies, Inc) – A Report on the First Pennsylvanians: A stratified Paleo-Indian site in Liverpool, Perry County 

Paul Raber (Heberling Associates) – Looking Under a Rock: The excavation of Mykut Rockshelter 

Historical/ Industrial Archaeology

Amy Fanz (A.D. Marble & Company) – Industrial Archaeology on Moshannon Creek: The Phillipsburg Tannery site 

Barbara J. Shaffer (McCormick, Taylor & Associates, Inc.) – Food, Drink and Rest Next to the Pennsylvania Canal: Archaeological investigations at Gayman’s Tavern 

Historic Preservation

Thomas E. Boothby (Pennsylvania State University) – The State of the Art of Stone Bridges 

J. Dain Davis (PennDOT Engineering District 9-0) – Caring for Covered Bridges: District 9-0’s Covered Bridge Management Program 

Rick Ortega (Ortega Consulting) – Moving the King of Prussia Inn

Patricia Remy and David Anthony (PennDOT District 11-0) – A Delicate Balance: The story of St. Nicholas Church

Public Outreach and Heritage Tourism 

Brenda Barrett (National Park Service) – Byways to the Past: Heritage tourism and transportation networks 

Matt Hamel (PennDOT District 3-0) – The Bridges of Lycoming County: Rehabilitation of a Lattice Truss Bridge in the Pine Creek Valley

Robert H. Hosking Jr. (McCormick, Taylor & Associates, Inc.) – Floating into the Past: A transportation enhancement project at Hugh Moore Park 

David H. Miller (Society for the Preservation of the Duquesne Heights Incline) – Going Up: The transportation enhancement project at the Duquesne Incline 

Randy Cooley (Westsylvania Heritage Corporation) – Westsylvania and the Path of Progress: Regional heritage tourism development 

Hope Luhman (Louis BergerGroup, Inc) – Scouting for Lessons: The Merit Badge Program at Site 36TI116 

Kevin Patrick (Indiana University of Pennsylvania) – The National Lincoln Highway Study Act: What to do with a heritage corridor the size of a nation? 

Ben Resnick and Douglas H. MacDonald (GAI Consultants, Inc.) – The Coverts Crossing Project: A public outreach model 

Deborah Scherkoske (Skelly and Loy, Inc.) – Spanning the Yards: A bridge replacement and public history program at the Enola Yards 

Transportation Projects and Historic Preservation – Roundtable

Michael Ryan (PennDOT) – An Introduction 

Dean Schreiber (PennDOT, Bureau of Design) – Part One 

Earl Neiderhiser (PennDOT District 9-0) – Part Two

Elizabeth Merritt (National Trust for Historic Preservation) – The Big Picture

Planning and Implementing Historic Preservation Projects 

Ira Beckerman (PennDOT Bureau of Environmental Quality) – Historic Preservation at Transportation Agencies: The CRM Program at PennDOT 

M. Lynn Bortel (Federal Highway Administration) – Some Pennsylvania Issues: The FHWA and historic preservation 

Dan Deibler (Pennsylvania Historical and Museum Commission) – The SHPO’s Perspective 

Pat Foltz (Preservation Pennsylvania) – Byways to the Future: Some suggestions for preservation-sensitive transportation projects in Pennsylvania 

William Hunter (Heberling Associates) – Reforming the Place of Historic Preservation in Ohio’s Transportation Development Program 

Thomas A. Kotay (PennDOT, Center for Program Development and Management) – Getting Preservation Issues on the Drawing Board: The 12-year plan 

Perhaps the highlight of the 2ndYear’s Conference was witnessing lunch between Mike Ryan, our Deputy Secretary in charge of Highway Administration, and Betsy Merritt, who was a lead attorney for the National Trust for Historic Preservation, a group that had been known to sue us in the past.  They were engaged in a congenial conversation over things other than a particular project. If for no other reason that getting two sides to break bread in a neutral setting, the Conference was a success.

For the first eight years of this and subsequent MOUs, IUP hosted the Byways to the Past Conference at IUP.

Next: Legacy Collections without End: The Second IUP Contract (2002-2007)

The PennDOT and IUP Partnership: A Personal History -II

Part II – Business Process Re-Engineering and the District-Based Teams

By the spring of 1997, some of the weaknesses of the BEQ-based QP teams were beginning to show.  As noted above, there was difficulty in scheduling for scoping field views. The lack of communication with Project Managers and Environmental Managers limited trust.  The QPs ability to have input into the creation of design scopes of work was also constrained, as was the review of consultants doing the work prior to their being selected for a consulting contract.  Furthermore, the Adverse Interest Act put constraints on the types of projects our consultants could oversee.  By contrast Jamie McIntyre could cut through those problems and work much more closely with the Environmental Unit and Project Managers.  She was in the District, and as a creature of the District, was de facto part of the team.  The archaeology portion of Section 106 worked better in District 4-0 than elsewhere.

That spring, the Department rolled out a large initiative under the initials EMS (Engineering Management System), which suggested that each work unit re-engineer itself to improve productivity and to try to work the golden triangle of Faster, Betters, and Cheaper.  Our kick-off meeting was held April 11, 1997. The goals of our group were to:

  • Save the Districts time for smaller projects
  • Better value for our money
  • Take the guess work out
  • Preserve PA historic resources
  • Streamline the process
  • Cut design time researching historic resources
  • Improve predictability

Our cultural resources team had some advantages coming into this effort, as we had a newly minted PA, and established a team-based approach to Section 106, pairing above-ground specialists with below-ground specialists.  The re-engineering effort became a lab for additional ideas and suggested process improvements.

Although the final EMS recommendations were far-ranging and ambitious, the most important recommendation was to solidify staffing for the QPs.  Five options were developed, each with its own advantages and disadvantages.

Hire Qualified Professionals– In this scenario, all needed QPs would be hired by PennDOT.  This was clearly the cheapest option from a salary perspective. All QPs could perform all needed duties, including preparing and review proposals, and had the highest potential for the long-term.  The disadvantages were that the existing civil service classifications were not a good fit (see museum curators, above), the salary range might not attract the best candidates, and most importantly, it would require shifting complement within PennDOT.  Shifting complement is a kind restatement of stealing vacancies from other units. It doesn’t make you popular, either.

Use consultants– We had been using consultants and in this option, we would continue to do so, filling all needed positions.  We would be able to specify the skill levels we needed, and presumably we could get them on task faster. Also, as our needs changed, we could flexibly add or subtract consultants.  On the downside, it was the most expensive option (overhead and profit could multiply salaries by 2.5x), did not address the issue with the Adverse Interest Act, and consultants could not perform all of the needed duties, such as reviewing contract proposals.  In addition, there was a concern that consultants generally like to please their clients (us) and might make findings that unduly favor PennDOT, rather than making cold objective decisions.

Hire PHMC staff– In this option, we would enter into an interagency agreement with the SHPO to have them hire and dedicate staff to PennDOT projects.  Some states already used this model.  The SHPO could use their own PHMC classifications; it would not burden PennDOT complement; and, there was the potential for an instant sign-off from the field.  Unfortunately, this option would not address a key Programmatic Agreement goal of increasing delegation of responsibility to the Department, instead regressing back to the old methods of pressing the SHPO for sign-off.

Hire University CRM Staff– Several DOTs had already established partnerships with universities, although in each case it was to provide field archaeological studies.  Using a university in a slightly different way to provide QPs was conceivable, although we were more likely to find archaeologists than architectural historians on staff. This also had the potential to be a long-standing arrangement with the further advantage that being independent of both PennDOT and the SHPO, QPs could make independent judgments.  The question was whether there were any universities in Pennsylvania that would be in a position to enter into such an arrangement.

Retrain PennDOT Staff– This final option would have existing PennDOT staff trained as QPs.  While it would support the central EMS concept of doing our own work, and did not require additional complement, it would have required those individuals to undertake a 3-5 year program of education and training to meet the Secretary of Interior Standards for professional archaeologist and architectural historian that the PA called for.  Furthermore, it was suspected if we did retrain and delegate staff (probably not engineers) as QPs, they would most likely leave the Department for better paying jobs elsewhere, plying their newly acquired specialies.

At a July 23, 1997 presentation of our EMS Re-engineering to upper management at PennDOT, we received approval to move forward with the option to hire university CRM Staff.

Next:Part III – And Away We Go: The First IUP Contract (1999-2002)

The PennDOT and IUP Partnership: A Personal History – In Six Parts

Part I

This year marks the 20th anniversary of the cultural resources partnership between the Pennsylvania Department of Transportation (PennDOT) and Indiana University of Pennsylvania (IUP).  The partnership has served both agencies and over the years have provided staffing to PennDOT, helped move legacy archaeological collections toward curation, hosted conferences, launched and sustained a publication series, trained a generation of students in cultural resources management, and otherwise served as an exemplar to all state agencies in how they can play well together for mutual benefit.  This is that story, as I see it.  Please join me over the next several weeks.

The Bad Old Days

In 1993, I joined PennDOT after a brief career managing the archaeology program at the Maryland State Highway Administration.  I joined a small cultural resources unit in the newly formed Bureau of Environmental Quality, my coworkers being Deborah Suciu Smith, Chris Kula, and Dick Weeden.  The Bureau was led by Wayne Kober, who had formed it only a few years earlier.  In 1993, District 4-0 (based out of Dunmore, near Wilkes-Barre) also hired an archaeologist, Jamie McIntyre.  Chris, Jamie, and I were hired as Museum Curators, Archaeologist II, under the State Civil Service Classification.  In my 26 years at PennDOT, I never did see a PennDOT museum, nor did I every curate any collection other than pencils and compact discs. Go figure.  For a brief period, from 1993 until June, 1994, we worked in the old Transportation and Safety Building on the site where the current Keystone Building resides.  After the 1994 fire, we were temporarily housed then returned to the T&S building, until it was found unfit for habitation. We then operated out of a converted parking garage at Forum Place for about 4 years until in 2000 we moved into the Keystone facility.

When I joined BEQ, the National Historic Preservation Act was 27 years old and PennDOT had been conducting archaeological studies for about half as long.  The Bureau for Historic Preservation, i.e., the State Historic Preservation Office (SHPO), was housed in the Pennsylvania Historical and Museum Commission and was led by Brenda Barrett.  We were aware of the Federal Highway Administration, but in those days, FHWA was relatively disengaged with the day to day activities of the environmental unit.  Our day to day activities were of one of two flavors.  For smaller projects, PennDOT submitted a Preliminary Cultural Resource Review Form (PCRRF) to the SHPO for their sign-off.  Usually, the PCRRF was stapled to a 10 to 30-page report describing the project and potential non-effects the project would have on historic resources.  Our job was to conduct a quality control check on the package and shepherd it across the plaza to the State Museum, in which the SHPO offices were housed.  The second task we had was to manage report reviews of historic resource studies.  PennDOT project managers whose projects were likely to affect historic resources had the design consultant and their subconsultants prepare any necessary studies, i.e., historic resource surveys, criteria of effect reports, Phase I and II archaeological surveys, etc.  As these studies came into BEQ, they were assigned to one of a pool of management consultants who actually reviewed the reports and determined whether they were sufficient to hand off to the SHPO for their approval and sign-off.  Our job was to manage the management consultants and act as intermediaries between the management consultants and the engineers in the Highway Quality Assurance Division, who would draft and send the cover letters to the SHPO.  Given the pace of activities and the rate at which reports came into BEQ, it was a rare event when one of us would actually read the reports being sent over.  Most of the time we conducted the quality control on the comments prepared by the management consultants.  Even as I remember this process and write about it here, I must assure the reader that what I have presented was an oversimplification of the process, having left several intermediate steps out.

By mutual agreement between BEQ and SHPO, the deadline for approval or comment on the submitted reports was 60 days, so a third task we had was to track review times religiously.  PCRRFs was an expedited process, whereby a submission would return a response in 10 days.  On average, the review times were around or just under 60 days, but as much as a third of the reports were reviewed in more than 60 days.  Large reports such as data recovery reports might take up to 6 months for a review, although that generally wasn’t a problem as we had usually received a conditional letter of approval based on an executive summary and a field visit, so the project could proceed into final design.  This being before 1999, archaeological impacts were treated as not adverse if there was a data recovery, so no agreement documents were required to finish NEPA and get to final design.  PCRRFs were usually returned in 10 days; however, a more than insignificant proportion of them required resubmission due to incomplete information, so the Section 106 review for even minor projects could take several months.

In some ways, tracking reports was simple.  It came into BEQ and was stamped in with a  date.  When it was taken over to SHPO, it was stamped in with a  date.  And when it was returned to BEQ with approval or comment, it was stamped with a date. Each document was tracked on a Lotus 1-2-3 spreadsheet and we had a management consultant whose only responsibility was to track the coming and going of reports.  The only problems with the system as designed was that reports were lost being mailed or shipped from the District offices to BEQ, reports were lost at SHPO, and there were frequent arguments over reports that were stamped in on a Friday afternoon or a day before a holiday.  This being the land of engineers, every day was counted and tracked.

Jamie was hired by the Engineering District and did not report to BEQ.  Her duties were largely archaeological, conducting studies and managing the archaeological contracts carried out under the Prime consultants for various PennDOT projects.  Although we coordinated on issues and policy, she and the District operated largely independently from Central Office, which was the general rule in PennDOT.  PennDOT was and remains a largely decentralized organization.

Pivoting

While our routine in the early 1990’s more resembled paper pushers than archaeologists or cultural resources managers, two initiatives were afoot that would change that.  First was the development in Pennsylvania for a Programmatic Agreement (PA) to cover Section 106 activities for FHWA/PennDOT.  Program-wide programmatic agreements had become popular in the late 1980’s as a tool to gain efficiencies on coordination with the SHPO and to provide predictability to agency programs.  At the time the gold standard was the Vermont VTRANS Programmatic Agreement that delegated a lot of responsibility to professionals working for the Vermont Agency of Transportation.  This was a far-ranging agreement that carried a lot of weight and was the envy of the transportation profession.  Every DOT wanted one, but the problem was that Vermont was and is considered a “toy state” with a minuscule program and a very strong preservation ethic amongst it citizens.  PennDOT was the 5th largest transportation program in the country, and it was unclear whether a Vermont-flavored PA could be executed here.

Apparently, it could.  On December 11, 1996 a statewide programmatic agreement covering “minor” transportation projects was executed between FHWA, PennDOT, and the SHPO.  It was limited insofar as it did not cover projects with adverse effects and was limited to categorical exclusion level projects under NEPA.  Still, it represented a leap forward and covered a large share of the program.  The key features in this PA were:

  1. It established a class of activities that could be excluded from further Section 106 consultation by the nature of the activity.  They were small enough to be exempted.
  2. It created a class of PennDOT staff who could make exemptions under the PA, but who weren’t historic preservation specialists.  The class required training and oversight, but were delegated to make exemptions, as District Designees.
  3. It put the responsibility for making findings of eligibility and effect squarely back on to the agency, with PennDOT acting as surrogate for FHWA.  This is what the law intended and now it was going to be the responsibility of PennDOT to own the program and not shrug its shoulders, hand the decision to the SHPO, and then get angry.
  4. Finally, it created a class of historic preservation professional that were delegated to make findings of eligibility and effect on behalf of PennDOT and FHWA.  These Qualified Professionals (QP’s, or kewpies, as sometimes noted) were not SHPO staff, but PennDOT staff and its consultants.

Concurrent with the development of the PA (which actually took three years between proposal and execution) was the evolution of thinking regarding how and where these QPs would be used once a PA was in place.  Ultimately, the line of thinking resulted in a district-based team concept, with an archaeologist and architectural historian being placed in neighboring Engineering Districts and working together as a team closely with the design team and the environmental unit in the District. 

Getting from status quo to District-based teams was not a straight line by any means, but I would like to try to recreate path we followed.  As noted above, a central premise of the PA was that PennDOT would be providing qualified professionals to implement the Agreement, making findings of eligibility and effect.  First question: should these QPs be Department hires, consultants, or something else?  Second question: where should they be based?  Third question: to whom should they report?

As the PA was moving forward and toward signature and execution, PennDOT had to make decisions on how to implement, i.e., staff the Agreement.  In 1996, available Department staff included myself, Chris Kula, and Jamie McIntyre.  We were used to working with management consultants for the previous three years and knew their capabilities, and there was no way that the three of us could cover the Department, not including the fact that none of us were architectural historians.  As a matter of practicality, we would be relying heavily on consultants to augment Department staff.

The initial iteration on implementation paired an archaeologist and an architectural historian with each District.  Archeologists Jamie McIntyre, Chris Kula, Barb (Gudel) Shaffer, and Rod Brown were matched up with Jerry Clouse and Sue Peters on the above-ground side. Our management consultants were tasked with finding a third architectural historian, but through 1996, had been unable to do so.  By November 1996, three teams had been established to cover 11 engineering Districts, with an expectation that the third architectural historian would be provided by our management consultants.  At this point, other than Jamie McIntyre working out of District 4-0, there was no expectation that any of the teams would be District-based, as all of the QPs other than Jamie were coming out of Harrisburg.  Later on, District 6-0 (King of Prussia, near Philadelphia) hired Catherine Spohn in 1997 to serve as their archaeologist for projects in District 6-0.  In 1998, BEQ hired David Anthony to be based in Pittsburgh and be a staff architectural historian that would service the western Engineering Districts.  However, in 1996 and 1997, the PA was implemented largely with Harrisburg staff. 

Operationally, it wasn’t elegant.  PennDOT was a decentralized agency, with environmental review, design, and project delivery coming from each Engineering District.  Although BEQ was its own Bureau and reported directly to the Chief Engineer, each Engineering District was autonomous and also reported to the Chief Engineer, so that BEQ had no direct authority over the Environmental Managers or Project Managers in any District.  Our teams did review technical reports produced by consultants and submitted by the Districts to Central Office for coordination with the SHPO.  So at the beginning, the teams were intermediary between the project managers and the SHPO.  One implicit premise of the PA was that cultural resources expertise would be provided at the start of the project, which was the scoping field view.  To the degree possible, the teams travelled to each Engineering District to participate in these scoping field views and to provide input on what types of studies were needed going forward in design.  Initially this did not work well, as Project Managers were accustomed to establishing the scopes of work and handing the cultural resources off to the prime or sub consultant for completion.  More often than not, that meant cultural resources consultants were handed a soup-to-nuts list of studies to complete, with the assumption that a scattershot approach would not bog down the process.  It also meant that the cultural resources teams often were handed completed reports for work that in their opinions were not needed.  This created more than a little conflict.

As a consequence of the creation of the cultural resources teams, gradually Environmental Managers and Project Managers began to rely on their expertise, particularly when they were able to expedite the project by getting to an effect finding more quickly.  Gradually, the quality of reports submitted to the SHPO for comment improved as well, reducing the number of resubmissions due to extensive comments.  Clearly, BEQ professional staff were beginning to gain hold of the process and to actually fulfill the terms of the PA, moving from paper pushers to adding value.  Given that most of the QPs were based in BEQ and worked closely together, it was also possible to effect training and changes in policy or procedure very quickly, which is a distinct advantage of having a closely working unit.  And in addition to the QPs, the ability for trained District Designees to exempt projects based on the types of activities, also reduced the overall workload.  Those Stipulation C exemptions (made under the PA) largely took over the role that PCRRFs had accomplished only a year before, but with much less paperwork and much more accuracy.

Next: Part II – Business Process Re-Engineering and the District-Based Teams